Case Study

Case Study

Custom subsea clamps, delivered in 11 days

Custom subsea clamps, delivered in 11 days

Hyperion manufactured two custom clamp sets for an offshore oil and gas application, delivering the components within the client’s required 11-day programme.

Each clamp featured a two-piece bolted assembly shaped to fit around existing subsea infrastructure. This allowed the sections to be positioned and secured without needing access from the end of the pipework.

The components were manufactured in PP30GF, a 30% glass-fibre reinforced polypropylene selected for its water and corrosion resistance. Additive manufacturing enabled the bespoke geometry to be produced directly from the digital design, without dedicated mould tooling.

The project demonstrates how large-format additive manufacturing can support offshore applications requiring custom geometry, low quantities and short delivery timeframes.

Sector: Offshore oil and gas · Material: PP30GF · Quantity: Two clamp sets · Delivery: 11 days